Clicky

8:00 AM to 6:00 PM

Tehran, Pasdaran, Shahid Yousef Kolahdooz (Dolat) Street, No. 181

Conceptual studies and design of the wastewater treatment process for the cooling water pond of Phase 1 of Masjed Soleyman Petrochemical Plant, as well as engineering services and preparation of tender documents and tendering

2019

Project start year:

4

Running time:

Masjed Soleyman

Project Location:

MSPIC

Employer:

28147000

Employer's phone number:

Conceptual Studies and Design

Contract type:

About the project

The water purification process is where the pressure is reversed Osmotic flow of water through a semipermeable membrane is used to produce pure water and remove ions, molecules and larger particles dissolved in water.